PEACE OF MIND
ABOVE GROUND,
BECAUSE:
WE’RE TAKING CARE OF WHAT’S BELOW GROUND
We are New England’s Premier wastewater treatment provider. Check out some of our Residential and Commercial Septic System Installations.
WHY US?
We are the result of a third generation, family owned excavation and land development company that was founded in 1953 and still here today. We have the experience you’re looking for from end to end- from planning and design to installation.
WHY FUJI CLEAN?
As the world-wide leader in wastewater treatment, Fuji Clean is your trusted partner in the effort to protect, conserve, recycle and treat our water resources with the care and respect they require for future generations.
SEPTIC SYSTEM INSTALLATION CASE STUDIES:
Tred Avon River Nitrogen Reduction
Tred Avon is a major tributary of the Choptank River, which leads to the Chesapeake Bay. Location and soil conditions of this property are what created the special dispersal needs of this project.
System Rejuvenation on Tight Site on Whaley Lake
Failing metal septic tank in need of a rejuvenated leach field on a beautiful recreation lake in Dutchess County using a lightweight and small footprint FujiClean advanced treatment unit.
Surf Lodge in Montauk, NY
situated directly on Fort Pond, part concert venue, upscale foodie retreat, boutique hotel, local watering hole, and legendary performer hang out, it needed a new onsite disposal system.
Replacing an Overboard Discharge on Maine’s Coast
How to squeeze an onsite treatment system onto a tight difficult site, ensure seamless functionality and preserve the aesthetic of a remarkable ocean property on the Maine coast.
Overboard Discharge Units (OBD’s) for wastewater disposal in Coastal Maine
Given local setback rules and challenging soil limitations on the rocky coast of Maine, many homeowners found themselves with overboard discharge units (OBD’s) for the disposal of their wastewater
Indian River Lagoon Nitrogen Reduction
This program intents to improve the lagoon’s health by implementing various projects such as muck dredging, oyster restoration, municipal wastewater treatment upgrades and septic upgrades.
100 lot subdivision in Florida near the Clermont Chain of Lakes
Build and develop 100 lot phase of subdivision originally platted with lots sized for connection to sewer, but sewer infrastructure was never completed, requiring less than 500 sq. ft. for treatment tank and field.
Compact Fuji Clean USA Unit to Replace a Failed Virginia System
The old wastewater system at the house was failing. Loudoun County, Virginia, wouldn’t allow a new conventional system because there was no room for a new drainfield and no possibility for pretreatment.